Marble Treads

Capability

The staircase is won or lost in the shop drawing

A finished marble staircase looks effortless. The work that decides whether it installs cleanly happens weeks earlier, in our workshop.

  • Shop drawings issued for approval before any cutting starts
  • Production starts only after the drawing is signed off
  • CNC cutting with hand-finished edges on every exposed face
  • Vein and book-matching layout signed off before production
  • Dry-fit and numbering: each tread marked to floor and position
  • Set-by-set inspection before the crate is closed
  • Export crating with a loading plan for mixed containers
  • Packing list and fixing guidance issued with every set
Tolerances, QC checkpoints, lead times, ports and Incoterms are confirmed per project in your quotation. We do not publish fixed figures here because they depend on the drawing, the stone and the destination.

Who we supply

Architects & interior designers

Shop drawings, samples and finish approvals before production.

Main contractors & installers

Numbered sets, packing lists and fixing guidance for the site team.

Stone distributors & fabricators

Consistent supply and private-label packing.

Villa, residential & hospitality

Multi-storey staircase packages, crated by project.

Frequently asked

Do you work from our drawings?

Yes. We issue shop drawings for approval before cutting and do not start production until they are signed off.

Can you match veining across treads?

Yes. We prepare a book-matching and vein-continuation layout for approval before production.

How is each set packed?

Every piece is numbered, protected on all edges and crated by project, with a packing list matching the drawing.

Can I request samples?

Yes. Tell us the variety and finish and we will arrange a sample box.

Ask a question or request a quotation →

Send us your drawings

Tell us the stone, the floor heights, the quantities and the destination. We will come back with a shop drawing and a quotation.

Request a quote